Viewing a single comment thread. View all comments

kcasper t1_jdh418s wrote

It depends on the situation.

I might consider the DRICORE subfloor system for areas like this. It insulates the concrete, making the room dryer. Can be shimmed effectively to get everything perfectly level. Far quicker than multiple layers of pouring and installing plywood. Although the underlayer should be vented or drained in some way. And you are paying for the benefits.

7

codenoggin OP t1_jdnx5rf wrote

DRICORE sounds interesting, I'll have to check it out. There is an old drain on the outside wall, so I don't think that would be an issue.

1