1feralengineer t1_jcbdbel wrote

The walls are block, but I assume they were laid on concrete footings. The first thing I would do is have the footings inspected; then make a decision about the floor.

My thoughts on the floor would be dependent on a long term radon test. If you have radon, then sealing the floor becomes a much higher priority than the amount of effort required.

8

teknowledgist OP t1_jcbkblw wrote

No radon. With the french drain, we'd be swimming in it already if there were.

2