I’ve done that with engineering approval. Depending on the width of the projector I’ve sistered joists next to the one cut and headered each end of the joist cut to the sistered joist. Depending on subfloor thickness and span rating and dead and live load above would determine the max span in the cut
Viewing a single comment thread. View all comments