Submitted by brandolinium t3_zzz7gq in DIY
XFirebalX_347 t1_j2em3i9 wrote
Reply to comment by brandolinium in Replacing tub with one 2in longer? by brandolinium
Did you also acount for the "mortar bed" and/or wire mesh that should be roughly 1/2" thick between the hardibacker and tile? Or is that not present?
Im not a framer but I've picked up things along the way. more often than not, as long you're not removing more than 30% of a 2x4 depth, it shouldnt compromise the structural integrity, unless there are 3 or more sandwhiched together. Those are probably directly carrying the load of whats above them.
Even with brand new houses ive seen things shaved down notched out. Especially in remodeling jobs.
Viewing a single comment thread. View all comments