VitaminPb t1_ixd9yq9 wrote
Reply to comment by Admiral_Fancypants in HVDC macrogrid would reduce climate pollutants and electricity costs while transmitting low-cost renewable power by manual_tranny
If you read it, they need buried lengths of 50-95 KM cable (big slop factor there, non trivial task to dig) to break even, and about 800+KM runs for non-buried cables. Those are very long cable runs.
Viewing a single comment thread. View all comments