STrRedWolf t1_j2u7sta wrote
Did you ever get the full-length buses back in service (outside of the diesel-generated electrics, those were useless in the snow)?
BmoreCityDOT OP t1_j2wsecs wrote
We have two types of busses, but they’re both full length. Both are being used. Is that what you mean?
STrRedWolf t1_j2xo5tp wrote
Actual 2-3 door buses, not 1-door coaches (rented from the contractor).
Viewing a single comment thread. View all comments