Wilforks t1_j6nnfvk wrote
Reply to comment by Master_Dogs in Extremly Unrealistic Fantasy MBTA Subway map. The Silver Line is converted into light rail. Let me know what your favorite part of the map is and what I missed. by Wide_right_yes
I think the length of the line is a part of the problem though, the number of trains needed to keep the line running frequently enough to make it convenient would be so high compared to ridership that it wouldn’t make sense as an investment in space and resources.
Master_Dogs t1_j6o1t2e wrote
Hmm, possibly. MA 128 is 57 miles long according to Wikipedia. The longest subway route in NYC is 32 miles long according to Google. I don't think the OP did the entire length of 128, since it cuts over to Salem instead of going to Rockport. So it might be a stretch to make the Yellow Line truly subway like (5-10 minute headways) but there's a number of Commuter Rail Lines that are that long (Fitchburg Line is 54 miles long apparently) that have hour or so headways. I imagine you could get 20 minute headways without totally breaking the bank, which might be useful enough for some folks.
I agree it's not a great investment, but in the Grand scheme of things we spend billions on highway maintenance each year (last I saw, something like $1.5B through MassDOT) so if we wanted to divert some of those resources, or increase taxes to fund more transit, at some point a Yellow Line would make some sense. But not until we've gotten the inner line running, and all the various extensions to 128 in the first place. Even then I don't know if running rails would make a ton of sense. Rapid Bus service might make more sense and be a lot cheaper. Just take 1 lane on 128, make it a bus lane, add some cameras/cops for enforcement, and run buses every 15 minutes. That would probably be totally affordable, especially since bus stations are dirt cheap and buses aren't terribly expensive.
Viewing a single comment thread. View all comments