yuvng_matt t1_j5wai03 wrote

12 years? Holy shit that’s ridiculous

9

ToadScoper OP t1_j5whjvn wrote

What’s interesting is that Amtrak was able to electrify 322 miles of the NEC between Boston and New Haven within only 5 years… this was in the 90s

12

dante662 t1_j5yki7s wrote

Silly question, but does the MBTA own the air rights above the tracks?

​

I'm guessing the major issues are tunnels overpasses which will either need to be raised, or they will need the battery hybrid trains to pass through those sections.

6