Submitted by MichaelRahmani t3_ytij3o in nyc
RAXIZZ t1_iw56qej wrote
Reply to comment by TeamMisha in 9th Ave redesign by MichaelRahmani
> NYCDOT's strategy is to avoid what is called "capital construction"
AFAIK, capital projects have to go through DDC. So it's not just much more expensive, but also requires cross-agency collaboration, which means it's basically impossible.
TeamMisha t1_iw57050 wrote
I believe you are quite right that sounds very familiar and you're spot on, some projects are already miracles to begin with so if you add two agencies into the mix then it's a giga-miracle, and 3 or more... not even god himself can achieve the coordination 💀
kapuasuite t1_iw7c49r wrote
New York City's bureaucratic feudalism never ceases to amaze me.
nycfoto t1_iw7dlb4 wrote
DDC is part of the cross-city agency collaboration for decades. DDC, DOT and DEP are sister agencies that work in tandem, but not always in the correct order.
For example, they would repave the road over a long stretch.....then rip up the streets to expand water mains and sewer pipes. Then patch up the pavement. Instead of doing it the other way around. Replace the underground pipes THEN put fresh new asphalt pavement.
I know. I used to work for DDC ;)
SI_MonsterMan t1_iw7lk2l wrote
Sounds like the revamping of the South Ferry terminal and Peter Minuit Plaza that had been rebuilt and torn up a half dozen times from 1990 to 2010.
nycfoto t1_iw7msso wrote
Ridiculous. Perhaps the contractors didn't build to spec. Drainage issues, possible post-9/11 secured barricades?
SI_MonsterMan t1_iwjngcz wrote
Nope. Grift.
Viewing a single comment thread. View all comments