Submitted by MWBartko t3_10kc3qj in pittsburgh
AirtimeAficionado t1_j5pxokf wrote
Reply to comment by w0jty in A T line from Pittsburgh International Airport to the Allegheny County Airport by MWBartko
Yes, but I don’t know if they could do them regularly/ if they could reasonably achieve those speeds for a long period of time on any realistic track configuration. I think 45 is a more realistic top speed that we would see, especially considering the grade that they would need to cover on such a segment, but I could be misguided here
w0jty t1_j5q4r3g wrote
The re-done blue line was designed and built to allow for hitting their top speed, but a variety of crossing and signaling issues have kept that from coming to fruition. The red line, downtown, and north shore certainly not going to get anywhere near that for sure.
As with all infrastructure, getting the planning right is only half the battle, execution can just as easily make or break a project.