That $26 million price tag is disingenuous in this conversation as it does not include the cost of the middlebury tunnel project. Some of your other proposed improvements are ludicrous. Rd-Wj will never happen. No existing right of way and very heavy grade territory especially if you want a stop at the top of Killington. You will never be able to secure funding for that project when there is already an existing route RD-BF-Wj. And none of this is going to work with existing freight service on these lines. For viable commuter rail on any of the existing lines you would need considerable amount of double main track installed or a lot more passing sidings (not filled with storage cars).

Edit: it’s the same reason why All Earth Rail failed. Blittersdorf bought a bunch of passenger cars without any thought of how or when or where they would operate and how the existing railroads operate. He wanted to run passenger service between Montpelier and barre… Dangerous heavy grade territory that is FRA excepted (illegal to run passenger service on).

1

DrToadley OP t1_j6lah3s wrote

Looks like we have a lot of work to do before a lot of these lines are feasible. Thank you for that reality check! I think we need to focus on the lines which would be obviously sound economic investments (Montreal to Boston being #1). However, I also don't want to dream too small, either, especially in a theoretical Reddit thread.

2