SandBoxJohn t1_itxfelr wrote
Reply to comment by Awkward_Dragon25 in Metro studying Silver Line Express service by walkallover1991
A third track would have increased the costs likely resulting in the line not being built at all.
There were several changes made to the design of the project to cut costs to get the line built that resulted reduced operational flexibility and the number of trains that could be run on the line per hour.