liquibasethrowaway
liquibasethrowaway OP t1_j1w0ve9 wrote
Reply to comment by keyjan in Questions about the Purple line? by liquibasethrowaway
Awesome thanks for the reply!
liquibasethrowaway OP t1_j1w0jn2 wrote
Reply to comment by Zwillium in Questions about the Purple line? by liquibasethrowaway
Thanks for backing me up boss. This post came back from -1 haha
liquibasethrowaway OP t1_j1vcp1d wrote
Reply to comment by BourbonCoug in Questions about the Purple line? by liquibasethrowaway
Yeah I think it's 'projected' to be open in 2026, but these things are never on time.
That being said as someone who lives in the area along the route I'm really hoping it will be usable but I'm not sure given it doesn't actually "connect" with the existing train stops (you'd need to walk decently far and enter a separate building to do transfers to existing lines).
Also have seen how bad the Baltimore light rail is and I'm worried they cheaped out, when they should have just paid the money to get an actual additional metro line built the way the others are (the current lines do not need to stop for pedestrians and drivers going when they shouldn't).
Hoping I'm wrong and this will seamlessly connect with the existing system, but was hoping someone with more info could shed some light.
liquibasethrowaway OP t1_j1w12k5 wrote
Reply to comment by -JG-77- in Questions about the Purple line? by liquibasethrowaway
You are the best, thanks for typing this out, sounds like it will be a lot more useful than I thought it would be haha, great to hear!