ringnail t1_je72pv5 wrote on March 29, 2023 at 9:45 PM Reply to Building an non-load bearing interior wall in my finished basement, what do I fasten then top plate too? The wall would stand in between and parallel with the ceiling joists. by schmennings If you can expose the joists, run a 2x4 span between the joists and anchor with framing nails then throw your wall and anchor accordingly. Permalink 9
ringnail t1_je72pv5 wrote
Reply to Building an non-load bearing interior wall in my finished basement, what do I fasten then top plate too? The wall would stand in between and parallel with the ceiling joists. by schmennings
If you can expose the joists, run a 2x4 span between the joists and anchor with framing nails then throw your wall and anchor accordingly.