Submitted by bayside_tigers t3_zv3dvl in DIY
2001sleeper t1_j1mux5e wrote
Add dirt. Make sure your gutters are sized right.
bayside_tigers OP t1_j1mw3py wrote
Thanks - would I need to build up the level of the entire plant bed to be higher than the highest point in the yard? Or just enough to get the level in the plant bed itself to slope away?
2001sleeper t1_j1mxkoz wrote
Needs to be high enough so the water does not pool by the house. Grades don’t have to be drastic to shed water. I would make it slightly higher than that walkway in the picture. If you have low spots in the yard you may want to think about a drainage channel. Yard work is easy, but time consuming.
bayside_tigers OP t1_j1mxxeb wrote
Good deal, will give that a shot. Thank you!
Viewing a single comment thread. View all comments