Viewing a single comment thread. View all comments

BTTammer t1_j9shywq wrote

This. I did rebar only through the first timbers on the ground. Then, i staggered the second layer so the rebar was covered and used lag bolts to fasten the two layers. Kids used the area for 10 years and never had an issue.

Bonus: If you want to reconfigure the area you just lift the timbers up off the rebar, reposition, and drive the rebar into the new area and slip the bottom timber with the hole over it.

3