Viewing a single comment thread. View all comments

frzn_dad t1_jd83dxq wrote

There are likely construction drawings for any new construction. What there aren't and you probably want is asbuilt drawings showing any changes that happened. Those require each sub elec, hvac, plumbers, framers to keep red lines to give back to the engineer or architect and some one to then make all the corrections.

Not uncommon on large commercial jobs, would cost more than the average person would want to spend in residential construction. Also asbuilts usually aren't perfect even after all the time and money spent on them.

6