Submitted by vasquca1 t3_1205b5t in Pennsylvania
KindKill267 t1_jdjcj7p wrote
Reply to comment by SlimeySnakesLtd in Chewy to close large central Pa. fulfillment center by vasquca1
Why the time difference in ground vs roof solar panels?
SlimeySnakesLtd t1_jdke0e8 wrote
Set and forget vs continually screwing with them/the corporate need for every time you purchase the building to inspect and replace. Lower tolerance of failure. If you have a lot of panels, losing 3 or 4 is acceptable.
Viewing a single comment thread. View all comments