Viewing a single comment thread. View all comments

metsurf t1_j6mz9rp wrote

Under-designed and not funded fully at the federal level. State would have been on the hook for a lot of it. It was going to terminate in the vicinity of the PATH 33rd St station with no definitive plan or funding for the terminus.

6

Chose_a_usersname t1_j6o1bp0 wrote

The old it's not perfect so let's do nothing routine

12

metsurf t1_j6ph7do wrote

No the it is a fucking disaster so do it right routine.

−1

Flashinglights0101 OP t1_j6n4ref wrote

Feds were funding $3 billion with a commitment for more. That was about half of the expected cost at the time. Today, Feds are funding double because the overall cost is double which is still half of the total cost. We are basically in the same place, just a decade later.

6

metsurf t1_j6n6fp4 wrote

with a better design and more things included though.

5

thebruns t1_j6p2ixv wrote

> going to terminate in the vicinity of the PATH 33rd St station

You know thats better than what the current proposal is, which is terminating at 28th and 8th right?

1

metsurf t1_j6pgt8o wrote

Sorry but you are wrong 28th and 8th is directly adjacent to Penn Station.

1