Fun fact: the existing extension cost $4.45B for 1.8miles of track. The Q cruises at about 20mph through that section of track.
So when you’re going uptown from 63rd St on the Q you’re traveling at about $50B/hr or about $14MM/second.
Always a fun way to think about it while on the train 😊.
thebruns t1_jbp7s7w wrote
Heres another way to think about it: $4.45B is 2 days of defense funding.
ken81987 t1_jbovg5i wrote
Maybe we'll beat that record with the Harlem extension 🙂
Boogie-Down t1_jbp28gl wrote
To be technical you’d have to divide that by every individual train trip!
Bklyn78 t1_jbr08c4 wrote
20 MPH ?
The Q trains along the 2nd Ave section can get up to 40 MPH between stations.
bossman_k t1_jbrmkzc wrote
That actually doesn't feel very expensive, considering how many people will ride that second of track over its useful life