Submitted by iamstrugglin t3_y5dep5 in newjersey
Comments
iamstrugglin OP t1_isj78aq wrote
To struggle is an act of effort, we're trying.
Also you've got an interesting name as well.
SexWithAnAvocado t1_isjk2g3 wrote
Hey, I believe in you.
iamstrugglin OP t1_isjnnfj wrote
I couldn't ask for anything more friend.
Sufficient-Net-550 t1_isk2t6e wrote
Wholesome Reddit interactions like these make me very happy
iamstrugglin OP t1_isk2xbl wrote
No U!
Mithmorthmin t1_iskhtjw wrote
::fart sounds:: 🖕
Doowrag t1_isjijv4 wrote
I’m an Ironworker and was on the project a few years ago when we were setting steel. I had to weld these gigantic moment connections, some hanging from a wooden float because there was no way to get a 120’ man lift in position, it was pretty awesome. Looking forward to flying out of the new terminal soon and stay safe!
iamstrugglin OP t1_isjoizj wrote
Eyyy local 11 connector? Awesome story, you stay safe too brother.
Doowrag t1_isjwt02 wrote
Thanks but I leave the connecting to the pros, I prefer to just weld all day.
iamstrugglin OP t1_isjy638 wrote
Everyone does their part. Hopefully you can pass by one day and tell everyone what your part was.
THE_some_guy t1_isknfyx wrote
Isn’t welding a type of connecting? What’s the difference in this context?
If it’s not clear, I know almost nothing about steelwork. Please pardon my ignorance.
Doowrag t1_iskwzlk wrote
Oh that’s ok. The connectors I was referring to are the guys that work with the crane hoisting beams, columns, joists etc into place. They’re in what’s called a “Raising Gang” which is usually made up of 6 people. A foreman, a crane operator, two guys on the ground sending the pieces up, and two guys in the air.
Welding is fusing two metals together, we typically use welding rods or a wire feed machine. For the points I had to weld, I used the wire feed machine because it’s much faster than using welding rods.
iamstrugglin OP t1_islq1qf wrote
I love the wholesomeness of our tradesmen interacting with the community. MAD Jersey.
Gogh619 t1_iskvd26 wrote
Connectors are the guys that erect the steel and get them into place. Then the bolt up gang comes in and bolts it up, unless it calls for a weld, which in that case a welder would weld. There are times where you might need to weld to hold a piece in place, but that doesn’t happen too often.
Unknown_Species666 t1_isizsmz wrote
Never been to terminal A. Only B and C. Where are you headed?
iamstrugglin OP t1_isj193u wrote
To build the new terminal friend 😁
Sinsid t1_isj4jwo wrote
See you again in 15 years!
iamstrugglin OP t1_isj4lor wrote
Lmao 🤣 hopefully not, I wanna start the next terminal.
ipoopedonce t1_isjduib wrote
Terminal D?
iamstrugglin OP t1_isjfru1 wrote
Terminal Deez nuts!
Nfield87 t1_isjwzcv wrote
Gottem!!!
cat_atomic t1_iskc9sv wrote
The stars aligned for that one 😂
[deleted] t1_iskc7ld wrote
[deleted]
Indin_Dude t1_ism1h41 wrote
The new Terminal A at Newark airport is scheduled to open next month.
iamstrugglin OP t1_ism1kcs wrote
😌
Indin_Dude t1_ism3q6l wrote
I hope it’s as or more sophisticated, modern, and efficient as some of the best in the world (currently most in Asia).
Illnasty2 t1_ism89kb wrote
Aiming for the stars huh? I hope it’s on par with airports in third world countries. By that comparison it would be a 1000% improvement
thebruns t1_iso0d37 wrote
Zero chance. November-Dec is the busiest travel part of the year and no airline will want to test things out during that time. Imagine if the baggage system breaks
Indin_Dude t1_iso3io6 wrote
I am sure they have done testing - and they still have the original terminal A and C. They can always temporarily revert flights back to old terminal A if they have issues
The new terminal A is for smaller aircrafts so think it will be for nearer destinations or destinations with fewer passengers.
thebruns t1_iso3s35 wrote
> The new terminal A is for smaller aircrafts so think it will be for nearer or less critical destinations.
This isnt true at all.
Indin_Dude t1_iso3zsk wrote
If you are so certain then perhaps you can shed more light on this terminal and it’s go live date
thebruns t1_iso47er wrote
I already did.
shadydoglies t1_isjj2lv wrote
I hope the bathrooms and food are better in this terminal but somehow i expect they will not be.
thephunkmaster t1_isjmk2x wrote
I have a food kiosk that will be open with the new terminal. I can confidently say the food options is TONS better with some healthier options mixed in too.
iamstrugglin OP t1_isjo28p wrote
Yeah the restaurants looks like they have great atmosphere. Maybe later on today I'll snap a couple more pictures and make an album on a new post.
Iccarys t1_ism6yub wrote
Any new lounges?
iamstrugglin OP t1_ism76bm wrote
squeaky sound There's a muhfuckin jungle gym. 🙉
brp t1_iskg7f1 wrote
I think anything would be an improvement over the current Terminal A.
Terminal C isn't too shabby now, just still a PITA with the choke points at the security exits.
-MACHO-MAN- t1_islw7js wrote
I don’t know about b but food in c is actually halfway decent now
[deleted] t1_isjfmfb wrote
[deleted]
iamstrugglin OP t1_isjfpyp wrote
The new parking garage is dope.
runnywetfart t1_isjqymt wrote
Like philly hopefully. Fucken easy. Park and walk to ur terminal. In and out. And cost effective.
iamstrugglin OP t1_isjrkbd wrote
Yeah the pedestrian bridge really affords that ease of accessibility in the new terminal.
sharkethic86 t1_isjwikj wrote
A and B both so bad rn. I know people complain C is expensive but damn it's nice.
talk_birdy_2_me t1_isjjmzo wrote
Is there a date for when it will be open? I'm flying out of A in a few weeks and was wondering if I'd be able to see the new terminal
iamstrugglin OP t1_isjnver wrote
Unfortunately I don't represent the airport, I would love to give you a concrete answer but I wouldn't want to lie to you.
EWR-RampRat11-29 t1_isjp19e wrote
We were told November 1. But OP would know if that looks reasonable.
iamstrugglin OP t1_isjp6f3 wrote
😣 I wish I could tell you with certainty.
Dozzi92 t1_isj8nss wrote
Saw some pictures of the inside, looks great.
snarkuzoid t1_isj945y wrote
Best of luck. It needs some love.
iamstrugglin OP t1_isjoxjq wrote
Thanks, we have a great group of people here.
BlackWidow1414 t1_isjhveu wrote
Is this terminal going to improve Newark's on-time percentage rates?
iamstrugglin OP t1_isji0gg wrote
I just work here lmao, my efforts are purely transactional.
taricua t1_isjsxej wrote
Yeah, yeah, passing the buck…
VaMoInNj t1_islq35d wrote
I think most of the issues are due to runway capacity, so doubtful. At least it will be a nicer terminal to wait in than the current A.
paintnprimer t1_isjqsq6 wrote
Pallets and pallets of paint going to this job. Keep it up!
iamstrugglin OP t1_isjr0rp wrote
Ey! IUPAT brothers in the house! Thanks for your efforts!
paintnprimer t1_isjsybs wrote
Just the people who get it in, tint it, and ship it. No union here 😭
iamstrugglin OP t1_isjt4ox wrote
Not with that attitude! Organize! ✊🏽
[deleted] t1_isjrd8u wrote
[deleted]
playdohplaydate t1_isjwgc6 wrote
My brother in law is working on Newark also with AECOM. He’s probably there rn juggling one of his many projects.
Dur-gro-bol t1_isj9ajd wrote
You mean terminal one
iamstrugglin OP t1_isjbxzm wrote
Yeah I was confused by that also. We were calling it terminal 1 since the beginning of the project. Maybe this sign isn't finalized? Not too sure.
Dur-gro-bol t1_isjcha2 wrote
Hahaha I just figured it was so workers and deliveries didn't go to active terminal A. They just called it "one" so it was different from A. I haven't been there in a month or two, it must look great. Besides the ceiling lol.
iamstrugglin OP t1_isjfxmc wrote
You know what, that never even occurred to me. That seems the most likely, were you working here?
Dur-gro-bol t1_isjjrnl wrote
Yeah I've been in and out for the past year or so. I'm in 254
iamstrugglin OP t1_isjnrcl wrote
Oh nice, we still have some carpenters here. Most of the rock is in but, it's getting close to punch list time.
rossg876 t1_isjjkve wrote
It was 1 until a new terminal 2 was cancelled. Now it’s just A
Dur-gro-bol t1_isjngfj wrote
Yeah the old terminal A is the oldest one right? I figured they would just use this new one for A,B,C as they redo them all.
EWR-RampRat11-29 t1_isjpdbz wrote
We were also told Terminal one, yet I keep seeing information with it being called Terminal A. So who knows. Maybe it’s to make even harder to get into and out of the airport.
Dur-gro-bol t1_isjpzlj wrote
Yeah I figured it was just a title for development, easier to tell workers and deliveries to go to terminal one then terminal A.... No not that one the new one. Go around and go to the south area of the airport. Yeah that huge dirt area, that's terminal A too lol.
Pepalopolis t1_iskoy55 wrote
Thank you for doing the work my friend! Great to hear. What was updated? I haven’t been to A in a while.
iamstrugglin OP t1_iskp37z wrote
Thank you & it's an entire new terminal 😀
Gogh619 t1_iskuoye wrote
Yeah, they’re tearing down terminal A and B once terminal one is up and running.
noping_dafuq_out t1_islpi43 wrote
That's great and all, but daddy wants his Centurion Lounge at Newark.
iamstrugglin OP t1_islpn93 wrote
Is that the design? It's unique with the bamboo. The bathrooms are dope too.
analdelrey- t1_ismnpl7 wrote
My dad's working on the elevators here
iamstrugglin OP t1_isngcmn wrote
Nice! Local 1 family! I probably know your dad, are you looking to get into the trade as well?
analdelrey- t1_itlxg6x wrote
Yes he is part of local 1! I would love too...he tried to get me into a program a year back. It was something for women specifically to get in.
My dad's old as fuck, I'm hoping he retires after this job. He doesn't want to, but he needs to
iamstrugglin OP t1_itlxvq9 wrote
Huh, I only know one old fuck of an elevator constructor. Ironically he's the one who has been most friendly to me and the crew 🤣
You should join up the trades need more strength in diversity 💪🏽
analdelrey- t1_itprodg wrote
His name wouldn't start with 'R' by chance would it?! You might know my dad lol. He builds elevators!
ASlap_ t1_ismvu26 wrote
Hell yea cuz. I worked there for two years until I took a layoff beginning of August. Local 164 🤙🏼
iamstrugglin OP t1_isngm0m wrote
One of my brothers! Represent!💪🏽 Inside wire or telecom?
ASlap_ t1_isqnzjv wrote
Inside Wire, what about you?
iamstrugglin OP t1_isqoflj wrote
Telecom making that A rate 🤑
taricua t1_isjspf3 wrote
Is this going to help the big mess that getting to terminal C is right now?
iamstrugglin OP t1_isjswfj wrote
Hopefully? It seems like the design is superior to the other terminals. I'm not a civil engineer though so I'm going purely off esthetics.
[deleted] t1_isjsr7m wrote
What will they do with the flag atop Gate 17 (the gate that Flight 93 left from)?
iamstrugglin OP t1_isjtc5p wrote
Good question, I'm assuming it's going to stay in its location or be transplanted. I can still see it air side.
ReggieNJ t1_isli7dx wrote
It's supposed to become part of a permanent memorial inside the new terminal.
iamstrugglin OP t1_islqi25 wrote
Oh nice it was transplanted. Maybe I'll snap a picture tomorrow and put a little album together of the construction.
OttomanTwerk t1_isk2hoj wrote
What airlines will fly out of the new terminal? I assume the old ones will be left for Spirit and Frontier because they are outdated, cramped, and filled with angry people.
iamstrugglin OP t1_isk2ue4 wrote
I can't say definitively who will be here. What I can say is I haven't seen those logos around the job site. AFAIK Air Canada, United and American are here. I imagine that could change at the port authority's digression though.
developerEnabled t1_isk8lnn wrote
50 years later haha 😂
[deleted] t1_iskg3le wrote
[deleted]
SleepyHobo t1_iskxxkf wrote
More overpriced food options yay!
Linenoise77 t1_isostzc wrote
I don't mind terminal C. Yes, you are paying more than you would elsewhere, but, uhh....its an airport. When you get delayed or deal with a connection, its nice to have the option for something other than mcdonalds, or even worse in terminal a's case, the earl of fucking sandwich. Even grabbing a beer in A is a pain in the ass.
Babhadfad12 t1_isp27gv wrote
You should see options other airports that didn’t give the food and beverage operations to a corrupt port authority connected company like OTG. Obviously, C was better than A, but still piss poor compared to other airports.
jhaze3 t1_ism4zjq wrote
Should of awarded job to a local contractor…would be open already! Tutor-perini are just terrible.
iamstrugglin OP t1_ism52yb wrote
Who would you have awarded it to? 😏
Congrats on your first comment of the year as well.
Agnestika_noine t1_ismd64z wrote
I thought this was a mausoleum.
iamstrugglin OP t1_isnfwu0 wrote
The burn out might be setting in from all the overtime but, trust me we aren't dead yet friend lol 😅
artinnj t1_ismfyn2 wrote
So does this mean they are going to try to get this up and going around the holidays? Can’t picture the CF that is going to happen.
Will be grateful to see the old Terminal A TSA screening go away.
iamstrugglin OP t1_isng2vg wrote
I would imagine the GC wants this done as soon as possible, and port authority even more so. There is still work to be done. I imagine it's soon but, there could be an unexpected "hickup" once the punch list phase begins. The only entity that has a clear and accurate time line is the GC unfortunately 😔
StrawhatPAT69 t1_isl53gn wrote
If by some reason, are you guys installing panels made from Bamco Inc.???
iamstrugglin OP t1_isl5b4m wrote
Huh, I'm not sure I'll have to get back to you on that one. I know it's like a composite material, who manufactures them, I'm uncertain.
StrawhatPAT69 t1_isl5mof wrote
Yes, that is exactly why I’m asking. We CNC those composite panels, fold, and install the hardware needed to put them up. We’ve been making a lot of those for the airport and the same color as well
iamstrugglin OP t1_isl5v8l wrote
Oh man, that's awesome are you guys machinists out of Lyndhurst's local?
StrawhatPAT69 t1_isl6g8k wrote
No, we operate in Middlesex. Right next to Bound Brook. I love working for them, we can make a lot of cool stuff with those panels. We also work with sheet metal panels and weld, all in house
SexWithAnAvocado t1_isj6ca3 wrote
Your username doesn’t leave me any optimism about the project.