Submitted by Elegant_Schedule1566 t3_zl38ys in vermont
I am expecting a huge cost estimate for running power up a hill about 500 yards to a future homesite. I don’t know the details of what all will be needed to do this and would much rather just have a solar array and generator, but that presents lending issues on build loans so I’ll likely have to tie into the grid. Would love some ideas of what to expect (and yes I’ll contact GMP also but would love to hear from those with personal experience in doing this)
Nutmegdog1959 t1_j032939 wrote
You're looking at $50-75k. If you're near a service pole with a transformer, and you buy and install your own service poles that are to GMP spec, you might be able to save. But either way it ain't cheap.