fungi_blastbeat

fungi_blastbeat t1_j9v7tkz wrote

Word is that scenario 2 is by far the most popular plan based of polls septa has done.

When the R6 runs, you can get from Manayunk station to Market east in less then 20 minutes if there's no hold ups, and 25 with moderate hold ups.

That's on par with trolleys from deeper in west Philly getting to 13th st. Except the added benefit of 0 car traffic.

19

fungi_blastbeat t1_j9v5qy4 wrote

Subway to Roxborough like the city originally intended. For Manayunk they should do the absolutely possible thing of turning the R6 into a metro line, like what's shown for the Reimagining regional rail scenario 2.

15 minute all day trains with trains that have at least 3 entrances, El style seating, and entrances that are platform level. Boom Manayunk elevated subway made.

72