Grass8989 OP t1_jbo8pui wrote

“Why don’t we build better mass transit infrastructure?”

−1

edcba11355 t1_jbo9729 wrote

And I wonder how long it’s going to take?! It took MTA more than 3 years to install a single elevator, god knows how much money!

74

ThreeLittlePuigs t1_jbobju2 wrote

I mean, just because we do it poorly now doesn't mean we shouldn't still try and build more and improve the process.

That being said if I am reading the subtext of your comment properly, it's laughable when the fuck cars folks just say "just ride a bike" or "just improve infrastructure" as if those things are always easy or accessible to everyone.

7

notqualitystreet t1_jbod1op wrote

And large sections of tunnel have already been built- wtf is up with these costs

184

drpvn t1_jboegbh wrote

Pull the plug already.

−2

calebnf t1_jboegz3 wrote

I wonder how much something like this would cost in, say, London. Infrastructure costs so much fucking money here and nobody seems to know why.

29

someliskguy t1_jbofanx wrote

Fun fact: the existing extension cost $4.45B for 1.8miles of track. The Q cruises at about 20mph through that section of track.

So when you’re going uptown from 63rd St on the Q you’re traveling at about $50B/hr or about $14MM/second.

Always a fun way to think about it while on the train 😊.

58

Nathaniel82A t1_jbofte0 wrote

I mean, I think most of us know why.. but we aren’t prepared to tackle that kind of shit at the moment. Same reason the military budget is so hyper-inflated. Government contracts tend to disperse the money in a “particular way” unlike private sector contracts.

26

k1lk1 t1_jbogppx wrote

> “To land that grant once and for all, US DOT is requiring us to demonstrate that we're going to have financial stability in our operating budget so that we can pay for the operation of a new train line in addition to everything else,” Lieber said. “Not for nothing, we've been promising East Harlem and central Harlem, the Second Avenue Subway since Joe Biden was like 10 years old.”

Lmao

70

socialcommentary2000 t1_jboh6zm wrote

This is just stupid. Just plain stupid. Buy a bunch of blimps and float them across town. More scenic, just as ridiculous.

6

The_Lone_Apple t1_jbohmw0 wrote

A complete boondoggle putting money into the pockets of grifters.

4

NetQuarterLatte t1_jbohxnr wrote

>The project would extend the subway line by 1.5 miles from East 96th Street. It would add three new stations: one at East 106th Street, another at East 116th Street, and a new level beneath the existing platforms at Lexington Avenue and 125th Street.

$7.7B is a lot, but the price tag doesn't mean it's not worthwhile.

Absent from the article is how much the MTA expects to collect in fare revenue from this expansion. Couldn't future fare revenues be used to finance the construction?

6

Grass8989 OP t1_jboi3tz wrote

No one seems to be coming up with a way it could be done more cost effectively, and with unions and regulations (which are important as these stations need to be made safely), I doubt they could cut much of the costs.

Edit: if anyone downvoting would like to tell me an actual plan that can reduce costs associated with building new subway stations feel free.

−5

domo415 t1_jboig77 wrote

> The new price tag includes interest payments on debt the MTA expects to take out to build the subway extension.

I’m sorry, we give rich folks loan forgiveness via the PPP loan program. We give billionaires tax cuts and almost 0% interest loans.

But forgiving student loan debt or financial infrastructure projects? Nah they gotta pull themselves by the bootstrap.

I wonder if Hudson yards would have been viable if they got the same treatment as the MTA.

33

ThreeLittlePuigs t1_jboimgv wrote

I dunno I’ve never looked into the issue that much, but it’s not too hard in most big ticket items, like stadium deals, affordable housing construction, public housing repairs etc, to find ways to do things cheaper and more efficiently without jeopardizing pay or safety standards.

I’m sure there’s a competent bureaucrat somewhere that no one is listening to grumbling about different ways to do things better around MTA construction and expansion.

5

ketzal7 t1_jboimye wrote

It should not cost this much. Although it seems like it’s that 125th St Station under the 4:5/6 that is pushing up the estimate.

4

BLAUBOY t1_jbon6du wrote

If you do some back of the envelope math, you’ll see the numbers don’t square. Don’t forget that if you’re including fare revenues, you should also add operating costs including maintenance, which may consume all or most of the revenues on their own.

In any case, these construction costs seem laughably astronomical.

12

RedOrca-15483 t1_jbott7p wrote

3.4 billion for 7 extensions. 4.6 billion for SAS1. 12.1 billion for East side access which they fucked up unsurprisingly. and 7.7 billion for SAS2....I wonder if the MTA is willing to pull that massive checkbook for for outer-Boros transit expansion?

Also, its time to prioritize elevated railways over subways given the insane amount of ancillary infrastructure needed to construct and operate a subway.

18

Rottimer t1_jbotwjy wrote

That is true. Interest rates are pretty damn high relative to the last 20 years and only going to get higher until the fed sees higher unemployment and lower inflation.

1

LikesBallsDeep t1_jbou3wk wrote

They are replacing one escalator at the station near my office.. October to July (target, will probably be late).

Now I'm no expert, but how does it take 10 months to REPLACE an escalator? The structure already exists, the electrical is run,. You just replace the escalator which I'm also pretty sure you get all the parts delivered and just have to assemble.

39

LikesBallsDeep t1_jboumtx wrote

Because something is deeply rotten to the core in our process for building infrastructure to the point that it is just not affordable.

It doesn't have to be this way. Literally no other world class city in the world pays even a fraction of our costs.

The solution isn't to just somehow find 7.7 billion dollars for this, it's to figure out why the fuck it costs more than the 1 billion it would cost in London/Paris/Rome/Madrid/Tokyo/Singapore/Hong Kong/Beijing/Seoul/Osaka etc.

12

ketzal7 t1_jboun3n wrote

It’s more that the independent contractors and consultants that the MTA hires charge absurd amounts. If the MTA kept on more staff for large projects and did everything in-house you would have lower costs.

30

DJBabyB0kCh0y t1_jbourdk wrote

The escalators at Court Sq were down for like 4 months. Not even replacing, just repairing. I noticed they kept putting up new signs with different completion dates, and then eventually the signs just went away completely.

The escalators are still down about once a week.

41

CorporalDingleberry t1_jbov0z2 wrote

I wish phase 2 of the second avenue line was extending it south toward FiDi.

1

Cle0_thecat t1_jbov44s wrote

We are at an absurd level of estimating for all of my construction projects. We are having quotes come in 4x the amount estimated.

4

EdgeOrnery6679 t1_jbov911 wrote

A few years ago, Cuomo showed up to a MTA worksite where 130 people were supposed to be working unannounced and there was actually noone working while they were getting paid to be working there. Theres lots of corruption.

18

supremeMilo t1_jboy8d3 wrote

We should just pay China do come do this and just give the savings directly to people.

6

unndunn t1_jbozxvc wrote

> The new price tag includes interest payments on debt the MTA expects to take out to build the subway extension. The feds reported the previous price tag at $6.9 billion, but the MTA reported the number at $6.3 billion, a figure that did not include debt financing costs.

And they want to use congestion charge revenue to guarantee that debt.

I don't know how anyone can support this with a straight face. Except the car-haters of course, because they’re irrational.

7

tiregroove t1_jbp01rh wrote

>The solution isn't to just somehow find 7.7 billion dollars for this, it's to figure out why the fuck it costs more than the 1 billion it would cost in London/Paris/Rome/Madrid/Tokyo/Singapore/Hong Kong/Beijing/Seoul/Osaka etc.

Because hiring consultants to do that would itself cost $100M.

4

OilGlittering7034 t1_jbp0nir wrote

And yet you people still can't understand why people get upset about things like congestion pricing.

"How can anyone possibly not want the MTA to take more of their money to piss away frivolously with zero accountability???"

22

Boogie-Down t1_jbp2xmv wrote

You’re right, there should be something happening in outer boroughs too, but lets not act like one updated station in Manhattan doesn’t have New Yorkers from 3 to 4 different boroughs traveling through it daily.

8

MrNewking t1_jbp3dou wrote

Bingo ☝️

It costs less to hire contractors short term then the same cost of hiring and keeping staff.

Long term those contractor cost balloon and an internal team is cheaper, but it's political sucide to pay a higher up front cost so that the next guy in office has it cheaper.

15

shanninc t1_jbp3i33 wrote

If you want a fun comparison: India built a 21 mile line (underground, but cut and cover construction) with 27 stations as part of the Mumbai Metro system for 1/3 the expected costs of this Harlem extension.

The entire 220 mile, 286 station system is expected to cost ~$13B USD.

6

dspeyer t1_jbp3nuh wrote

IIRC escalators are a "buy American" problem. It doesn't make economic sense to build escalators completely in the US, so anyone with a choice imports the key equipment and this goes very smoothly. There isn't enough market for all-American escalators to sustain true factories. But government projects are legally required to source everything domestically, so parts get made in one-off metal shops. Then, when repairs are needed, everything's nonstandard and replacement parts can't just be ordered.

9

Active-Knee1357 t1_jbp4m4r wrote

The thing is why the hell are they in a subway station then? I had this same conversation with some MTA person and I couldn't get an answer lol. Get rid of that glass canopy or at least seal it so it doesn't leak all over the escalators when it rains or snows, and maybe they'll stop breaking down.

8

stewartm0205 t1_jbp4xwx wrote

What they need to do is extend the 2nd Ave line to the South East Bronx. And rebuild the entire South East Bronx densely. The should also extend it downward to Downtown Brooklyn. NYC can only grow as the subway grows.

8

dspeyer t1_jbp646r wrote

Even if the money gets thrown out, congestion pricing means that drivers suffer as much for their being on the road as everyone else does. So long as drivers stay insulated while everyone else receives their poison, noise, and occasional grievous bodily injury, they'll just keep driving whether they need to or not.

1

animetherapies t1_jbp6g2u wrote

But crime is a problem… the criminals stealing in front your face

0

Fig85420 t1_jbp7pu7 wrote

Am shocked!

  • says absolutely nobody
1

MrNewking t1_jbp7tt8 wrote

This all boils down to when that station was last rehabbed. It's all part of the contractual agreements brokered between the mta, the city and the company near the exit. The MTA gets access to a part of their property and the company gains an entrance to the subway but have to maintain a portion of it.

In this case, Citi group gets access to court sq via an entrance, but have to maintain the elevators.

There's a whole bunch around the city like this. Usually privately owned entrances/escalators/and elevators have an X at the end of their unique code.

11

dust1990 t1_jbpb2zz wrote

This project needs to happen. But it shouldn’t until the grift from MTA consultants and contractors and the ineptitude and complacency by the MTA with said grift ends.

6

yasth t1_jbpe6hw wrote

It is (more or less) true though, the first Bond issue was in 1951, with a start of 1952. Biden was born in 1942. I mean you can find a promise from the 20s onward, but since he was 10 is at least not crazy wrong.

Truthfully it is a good reminder that the good old days weren't perfect. NYC took a funded project frittered away most of it on other random projects and tore down the elevated line (under real estate lobby pressure) before even seriously attempting to replace it, and didn't manage to build anything for 60 years, and that only a shadow of the plan.

20

nonobility86 t1_jbpf65b wrote

$7.7bn for 116,345 population -- that's $66k per resident.

They should just give the money directly to Harlem residents and kill the project. That would be better for everyone.

2

atari_Pro t1_jbph0lm wrote

Genuine: someone explain how congestion pricing helps the MTA money problem? Quick glance, it looks like it would solve no problems for the MTA and only (maybe) reduce traffic while also costing avg people more out of pocket. Other than the net positive of reducing emissions, which could be achieved in a 1000 other ways, congestion pricing seems to only reward the corruption within the MTA/state. Lmk if I’m crazy.

5

gonzo5622 t1_jbpjaeb wrote

But these types of shenanigans have happened over decades. Other countries are able to build high functioning rail at fractions of the cost and time. If you’ve been to China or Japan, you’ll know how a country can build things quickly and efficiently.

19

GOT_IT_FOR_THE_LO_LO t1_jbpn7b9 wrote

Saying that the NYC subway runs "24/7" is questionable when it's basically unusable between the hours of midnight and 6am.

The difference is that other cities have competent people running them who manage to get things on a tight schedule. We need to stop accepting mediocrity and trying to accept the MTA's ineptitude and ask why we can't build anything efficiently in this country.

7

tiregroove t1_jbpnjq5 wrote

>Make the contract only pay out if they do and it is shown to work in practice.

That's not how consulting works though. What tangible metric would you use for 'works in practice?' Consulting isn't some low-skill endeavor you can have a bunch of interns doing. Plus the longer you wait on a project the more the price rises. Also 'get rid of the corruption' is a fun easy solution but almost impossible to implement in the scope of any NY construction project.

1

GOT_IT_FOR_THE_LO_LO t1_jbpr0vv wrote

I meant unusable. Getting anywhere in the middle of the night on the NYC subway these days means waiting 20-30 minutes for a train to _maybe_ show up if it's running at all on the weekends. And that's assuming you don't have to transfer?

2

OrphanDad t1_jbpr8mu wrote

Must be all of those extra consultants.

1

actionguy87 t1_jbps5y9 wrote

Absurd. The MTA needs to be abolished and rebuilt from the ground-up. The blatant fraud, waste, and abuse is simply depressing.

19

redwood_canyon t1_jbpw1lm wrote

I read a great article about the NY construction costs vs. Paris and other metros recently. NY cost 5x more and took many more years. There is so much corruption in the system here unfortunately

2

AmericanCreamer t1_jbqe411 wrote

I don’t care, do it. I miss having the feeling of progress during the 7 and Q extensions. We NEED to be expanding, I don’t care that it’s overpriced or it’s only three stations.

It’s an investment that will last hundred plus years, and it’s not gonna get cheaper

3

gonzo5622 t1_jbql43f wrote

Yep, and that’s my point, our system is just so stupid. It took 5 years of squabbling to get the WTC rebuilt. That’s a stupid long time to rebuild something that became a symbol for us, and it was all of because of “authority”. These other nations are much more efficient and will move obstacles to enable progress (at least when it comes to infrastructure).

2

sumgye t1_jbqodk2 wrote

The subway situation is easily solvable. We just need to start putting the subway under streets again instead of miles underground. Yes we will need to dig up an avenue, but it will take less than a year of closures and it's not like there are a lack of streets for cars to use as alternatives.

8

_allycat t1_jbquupa wrote

There's a Trader Joe's near me that constantly has a broken escalator. Last year it was down for months. I asked an employee one day and they said the service company couldn't get parts.

Same story with a movie theatre elevator a few years ago.

3

LikesBallsDeep t1_jbqv2mt wrote

Ok.. well then maybe don't start the escalator replacement in a busy station until you have all the parts needed in a warehouse. It was planned work, they had notices up months ahead of time. Did they not know what components go into the replacement escalator? Don't think supply chain issues are a valid excuse right now.

2

Peking_Meerschaum t1_jbqz80s wrote

The PPP loan program existed because the government forced businesses to close due to the pandemic. Of course the businesses should be compensated and not forced into bankruptcy because we went through an emergency (which later turned out to be less dangerous than feared). Also, the PPP loans were specifically done so that employees could be kept on payroll and not laid off when everything was forced to close. It wasn’t just a hand-out to business owners.

No one forced anyone to go into debt to go to a liberal arts college.

1

woodcider t1_jbr83u0 wrote

And there are probably more underground utilities than there were in “cut and cover” days. There’d be no cost savings with the addition of massive road closures that are also a financial drain.

6

gobeklitepewasamall t1_jbrru4h wrote

The issue is all the unknown unknowns under ground. Nyc is a maze of underground infrastructure, much of it ancient, orphaned tunnels and wire and pipe, and whose builders aren’t even around anymore. There isn’t even a unified map, they’re just starting to collate and digitize what fragments they have, but, this being ny, it’s a slow, tedious process full of red tape, inter factional dick measuring, government incompetence and refusal to talk to anyone in another office of the same department, let alone outside agencies or industry.

I’ve been saying for years that we need a single, central, searchable database for everything under our feet here. Something we can collate into a 3d cad map.

10

Jarreddit15 t1_jbrv8xq wrote

That's my favorite part. It was never about the environment or reducing traffic

They're already looking to use the congestion revenue to guarantee new financing. That doesn't sound like they expect it to keep drivers off the island

2

doctor_who7827 t1_jbry5mq wrote

This is fucking ridiculous compared to the costs of similar projects in other cities like Paris.

1

gobeklitepewasamall t1_jbs2pa6 wrote

I used to work a night job in Williamsburg. I had to commute from bay ridge. It’d take me over 2 hours every single night to go one way. One night I missed a g train, the next one was 50 minutes away. It’s ridiculous. And that was after I waited 36 minutes for the r.

That’s an hour and 26 minutes, out of a total commute time of two hours and 20 minutes. Driving it takes under 20 minutes at that hour. It’s insane. Admittedly, taking the l from union square was slightly less horrific, but the long slog on the r (cause the b always runs local at night anyway) to union square almost made it even.

And the worst part was I wasn’t even going that late, I had to pick up a truck between midnight and 3 am. The wide discrepancy, ofc, was because I lost access to a motor vehicle a week into the gig.

The saving grace was that the ridiculously long commute there meant that by the time I clocked out and dropped the truck off, I’d be coming home at the opening of the morning rush & it’d take me 45 minutes to an hour.

Every other night job I’ve worked was in such a location that it just didn’t even make sense to take the train at that hour, I’d just walk miles or drive if I could. I used to love working an ambulance at night, totally different vibe than during the day..

2

jeffsayno t1_jbsfo00 wrote

damn, should have just made another grand central station for that price

1

Cascando-5273 t1_jbsl664 wrote

I think you're right, but I have one question - why is it irrational to hate cars? (Whenever I see words like 'irrational' used in the same sentence as 'because' I wonder if something worth discussing is being avoided or denied.)

5

Cascando-5273 t1_jbslp54 wrote

A personal perspective: I lived outside of Bangkok when they constructed extensive elevated trains and roadways (early 2000s). If you want to see a model of failed projects, take a look at them: unbelievably expensive and corrupt, and not cost-effective either. The problems the projects were meant to address were worsened, and most of the money went down the drain. The only people helped were grifters.

1

Sams_Butter_Sock t1_jbtf93v wrote

I’m gonna be dead by the time I can ride the second avenue subway

1

TeamMisha t1_jbud0jd wrote

> someone explain how congestion pricing helps the MTA money problem

The legislation passed by the New York State Legislature mandates that the CBD tolling (congestion pricing) raise $1 billion per year that must go to the MTA's Capital Budget. The Capital Budget is what funds projects and construction, such as this proposed extension.

> Other than the net positive of reducing emissions, which could be achieved in a 1000 other ways

I think you are vastly underestimating the solutions available. Do you believe the city has unlimited money to convert private resident's vehicles into electric vehicles to address emissions? Also, one of the two primary goals of CBD Tolling is reduce congestion, which cannot be done easily either. You need an incentive to get people to not want to drive into the city. Either you make it physically impossible or harder to drive in (which will receive complaining and bitching, of course), or you enact a real cost to reduce trips into the CBD. The multi-year long Environmental Assessment analyzing CBD tolling was based on several goals, I cannot remember the exact numbers but I think it was around a 10% to 15% reduction in vehicles and vehicle-miles-traveled (VMT) inside the CBD cordon zone, which are arguably real, quantifiable, net positives for the CBD. Hope that helps a little.

2

TeamMisha t1_jbudgtv wrote

The cost will only keep going up. It's a valid question do we just plunge ahead anyways? The 2nd Ave did get opened after all, should we cease any expansions to the subway ever, or expand (at great cost)? I don't know the right answer, the costs are absurd and ideally work would be done now to reduce these costs through corruption investigations and reworking how the MTA does bidding and contracts. It also raises an interesting equity question, we spent all this money to connect the UES with the Second Ave Subway, plus largely white suburbanites with ESA, where's the billions to connect more minority neighborhoods like Harlem, and the future expansion to the Bronx?

1

PersonalFan480 t1_jbvazv1 wrote

https://transitcosts.com/wp-content/uploads/NewYork_Case_Study.pdf

Sums up as incompetence at every level of the MTA. The MTA does not have the engineering staff to build its own subways, nor to design their own subways, nor to supervise the contractors who would do the above. For that matter, they cannot handle even simple capital projects at a reasonable cost.

And the leadership, who are mostly political hacks and career managers who haven't had an original thought in decades all drive and so do not use their own product. They also do not care nor want to learn about best practices for subway operations. Meanwhile the MTA, instead of developing in house capacity to handle capital projects, has created a stupidly complex rule book that inflates costs because for-profit contractors aren't just going to eat the extra costs of compliance.

4

planning_throwaway1 t1_jbxyrsb wrote

Yeah. Most places keep costs down by having more internal staff. We've largely gutted public staffing across the board, NYC's planning staff is a fraction of what it used to be.

Everyone is run ragged, so everything gets outsourced to contractors at 3x the cost.

Paris builds new rail constantly, at a fraction of NYC prices, despite being an old system, in an old city, with a river and riddled with catacombs below ground, with a heavily unionized workforce.

The big "trick" is they do it all in-house, only outsource if absolutely necessary, and keep contractors on a tight leash. Also, they don't have to do multi-year long environmental reviews and feasibility studies for every little project, they just do them.

5

planning_throwaway1 t1_jbxzoa1 wrote

Not to mention the importance of institutional knowledge, and just having the bandwidth to manage projects.

NYC used to have hundreds more planners and engineers on staff. All those jobs and more get outsourced to private consultants at 3x the cost now, while they're managed by an overworked skeleton crew.

4

Cascando-5273 t1_jby3ri5 wrote

I agree - I was baiting (as opposed to trolling - my intent wasn't to irritate but to point out the emotionalized logical fallacy).

I also resent the pollution and ownership of private cars vs the fact that the US chose cars and oil over what was probably the best train system in the world.

We had effective and reasonably priced mass transit and gave it up so that the Rockefellers and the Fords could make insane profits (and later for Congress to get a cut for decades of preferential legislation).

3